News


April 2, 2012

Reserves and Operations update

PetroNeft Resources plc (AIM: PTR) owner and operator of Licences 61 and 67, Tomsk Oblast, Russian Federation, is pleased to provide an update on its operations.

Highlights:

· PetroNeft’s 2P reserves increase 36% to 131.7 mmbbls

o Sibkrayevskoye 49.83 mmbbls

· PetroNeft’s proved reserves (P1) increase 50% to 20.03 mmbbls

o Lineynoye 8.86 mmbbls

· Ledovaya No. 2a well achieves natural flow

· Arbuzovskoye pipeline construction completed; Development Programme on schedule

· Option to advance Sibkrayevskoye development later this year

· Production remains steady at 2,300 bopd

February 17, 2012

Operations update

· Year end production reached approximately 3,000 bopd; current production steady at 2,300 bopd

o Lineynoye Pad 1 responded to pressure maintenance

o Lineynoye Pad 2 fracture results below expectations

· Arbuzovskoye Development ahead of schedule

o Pipeline production expected to commence in Q2 2012

o Plans for 10 new production wells in 2012 progressing ahead of schedule

· Ledovaya 2a exploration well

o oil encountered in primary Upper Jurassic interval

o oil discovered in secondary Lower Cretaceous interval

· Cheremshanskaya No. 3 exploration well

o testing successfully completed; three separate oil pools discovered

o primary Upper Jurassic J1-3 interval tests good quality oil + water

secondary Upper Jurassic J1-1 + Bazhenov interval tests high quality oil